navleft
navright
undernavleft
 
undernavright
lnavl
Career
lnavr
   
lnavl
Courses
lnavr
Project Management Professional
   
lnavl
Partners
lnavr
 
 
 
 
 
 
 
 

 

Module 6:  Quality Center/TestDirector - 2 Weeks (24 hours)
As a Site Administration
  • Create Domain, Project, Users, Project Admin
  • Assign users to the projects
  • Configured Wait_Before_Disconnect feature
  • Configure mail interval, mail format, version control settings
As a Project Administrator
  • Setup/assign user to the project
  • Assign role/privilege to the user.
  • Created new users for project
  • Set-up groups/create new group role
  • Changed permission of the new role
  • Add users to the new role
  • Customized project entities
  • Defect field customization i.e. making a field as a required field
  • Create new user field i.e. test environment (DEV, ALPHA, BETA, PROD, QUAL) in defect window.
  • Requirement field customization i.e. making a required field
  • Requirement field customization like modified requirement type from the default (Hardware, Software) to Functional, Non-Functional, System Change Request etc.
  • Configuring mail
As a User
  • Enter requirements in the requirement section.
  • Prepare excel sheets for require to export in the requirement field
  • Export requirement to export in the requirement folder
  • Convert requirements from the requirement section to test in the test plan section
  • Develop design steps or test cases in the test plan section
  • Attach the screenshot for the steps, if necessary.
  • Create template for the common steps
  • Call template to the tests
  • Calling a manual test with parameters
  • Perform requirement coverage or linking one test case to one requirement in the Test Plan section or performing requirement traceability
  • Perform requirement coverage or linking one test case to many requirements in the Test Plan section or performing requirement traceability
  • Create test sets in the test lab section
  • Import test cases in the test set
  • Execute test sets in the test lab section
  • Log defect in the test lab section
  • Log defect in the Defect section
  • Attach the screenshot for the defect
  • Track/ filter defect in the defect section
  • Enter comment in the comment section after retesting the bug like ‘retest passed’ recommending to close this defect or retest failed, recommending to re-open
  • Generate graph and reports in the Requirement, Test plan, Test  Lab & Defect section
  • Schedule automated test to execute or running automated test scripts in batch mode
  • Create and automated QTP scripts using TestDircetor or Quality center
  • Test using QTP (Quality Test Professional)

  • Interview questions and answers discussion
  • Written test
  • Oral presentation test

Back to Course Module Previous Module Next Module


© 2009 PeopleNTech, All Rights Reserved